How much does MEP design cost in the UK?
MEP design fees depend on five things: the floor area, the type of building, which services you need designing, how far through the RIBA stages the design has to go, and how much compliance work comes with it.
What affects the price
- Floor area. Fees scale with size, but the rate per square metre falls on larger schemes.
- Building type. A warehouse needs far less services design per m² than a care home, a hotel or a commercial kitchen.
- Services. Electrical, mechanical (heating, ventilation, cooling), public health, lighting and fire alarm design are priced separately. Combining them usually costs less than buying them one by one.
- Design stage. Planning-stage input is lighter than a full technical design that a contractor can price and build from.
- Compliance. Energy statements, Part L (SAP or SBEM) and Part O overheating checks are often needed alongside the design.
Budget first, formal quote second
Most clients want a figure before they commit time to a full brief. MEPquotes gives you an instant budget range from a few project details and your floor plans, and a chartered engineer reviews it before a formal fixed quote is issued.