← All guides

Part O overheating assessments and TM59

MEPquotes guide · reviewed by a Chartered Engineer

Part O of the Building Regulations requires new homes, flats and residential buildings to limit summer overheating. Compliance has to be shown before work starts.

Part O overheating assessments and TM59 – Ways to show Part O complianceWays to show Part O complianceSimplifiedGlazing andopening limitsTM59Dynamic modelfor homesTM52Non-domesticbuildingsMitigationShading andventilation

Two ways to comply

When TM59 is needed

Large glazed areas, single-aspect flats, noisy or polluted sites where windows cannot be opened, and buildings with mechanical cooling usually need a TM59 overheating assessment.

TM52 for non-domestic buildings

CIBSE TM52 is the equivalent method for free-running non-domestic buildings such as schools and offices, often requested at planning stage.

Get an instant budget cost using MEPquotes